• 好色TV下载安装,好色先生在线观看,黄片APP好色先生,好色先生APP下载地址

    Welcome to濟南濟柴好色TV下载安装燃氣發電設備有限公司official website!

    Contact information

    Tel:
    +86-531-88012499
    Mob:
    +86-18668968402
    +86-18678860619
    Fax:
    +86-531-69958299
    Email:
    greenpowercn@126.com
    Address:
    Building 8, Shuntai Square, Shunhua Road,High-tech Zone, Jinan City, PRC

    Gas power generation project

    Shanxi 15MW coal mine gas power generation project

    Create a project and build a monument

    Case Introduction
    • List the emergency plan of hidden dangers and dangerous points, establish the registration system of
    • 總體情況介紹:

      山西15

      List the emergency plan of hidden dangers and dangerous points, establish the registration system of entering the power station, and improve the assessment system of the power station. (Emergency plan and system have been established and perfected)

      The sign on the pipe between the gas pump house and the power station is not clear. (Re-customized sign and posted)

      Gas generator adopts 400V low voltage grid-connected, need to develop special measures to standardize grid-connected operation. (Developed and made for wall hanging)

      If the problem involves the manufacturer, the installer will reflect it to the manufacturer and come up with specific handling suggestions. (The problem has been copied and reported to the manufacturer)

      The smoke exhaust pipe has no insulation measures, and the explosioning device is located in the generator room. Isolation measures and warning signs should be taken outside the room. (Flue heat insulation measures have been completed, explosive-discharge device has been contacted by the manufacturer must be issued by the manufacturer and implemented)

      The gas power station shall be included in the scope of safety production inspection of the Shuileng mine, and the Shuileng mine shall carry out safety inspection and evalsuation on a regular basis, and the inspection contents shall be reported to the power supply Department and the Safety supervision Bureau.

    Jinan Jichai Huanneng Gas Power Generation Equipment Co., Ltd
    • 服務熱線

      0531-62325028
      0531-69951266

    Shanxi 15MW coal mine gas power generation project

    Do a project, build a monument

    List the emergency plan of hidden dangers and dangerous points, establish the registration system of

    山西15

    List the emergency plan of hidden dangers and dangerous points, establish the registration system of entering the power station, and improve the assessment system of the power station. (Emergency plan and system have been established and perfected)

    The sign on the pipe between the gas pump house and the power station is not clear. (Re-customized sign and posted)

    Gas generator adopts 400V low voltage grid-connected, need to develop special measures to standardize grid-connected operation. (Developed and made for wall hanging)

    If the problem involves the manufacturer, the installer will reflect it to the manufacturer and come up with specific handling suggestions. (The problem has been copied and reported to the manufacturer)

    The smoke exhaust pipe has no insulation measures, and the explosioning device is located in the generator room. Isolation measures and warning signs should be taken outside the room. (Flue heat insulation measures have been completed, explosive-discharge device has been contacted by the manufacturer must be issued by the manufacturer and implemented)

    The gas power station shall be included in the scope of safety production inspection of the Shuileng mine, and the Shuileng mine shall carry out safety inspection and evalsuation on a regular basis, and the inspection contents shall be reported to the power supply Department and the Safety supervision Bureau.

    Next:山西20×500
    網站地圖好色先生污下载 好色先生TV下载安卓 好色先生下载苹果手机安装IOS 年轻的母亲国产麻豆精东 91视频下载安装 91麻豆精品国产自产精品观看 99精品欧美一区二区蜜桃免费 黄瓜视频观看官网 草莓视频在线下载观看 草莓视频在线观看免费下载